Requirements for the electrician ..........10 Mounting ..................12 User case ....................13 One M2306 and M2307 .............. 13 One M2306 and M2307 .............. 15 Up to two lifts per building ............17 Up to four lifts per building ............18 Operation .....................
ABB devices Pos : 13 /Busc h-J aeg er (Neustr uktur)/Modul- Struktur /Online-Dokumentati on/U mwel t (--> Fü r alle D okumente <--)/Hinweis e/Hi nweis - U mwelt - ABB El ektr ogeräte @ 19\mod_1323162745839_15.doc x @ 110867 @ @ 1 All packaging materials and devices from ABB bear the markings and test seal s for proper disposal.
Fine-wire clamps 20 V DC – 30 V DC Bus voltage Size 4 TE Protection IP20 Operating -25 ° C – +55 ° C temperature M2306: 90 x 72 x 65 mm Size M2307: 216 x 110 x 45 mm...
Pos : 22 /Busc h-J aeg er (Neustr uktur)/Modul- Struktur /Online-Dokumentati on/Übersc hriften (--> Fü r alle D okumente <--)/2. Ebene/G - L/Lastarten @ 20\mod_1326269704379_15.doc x @ 136905 @ 2 @ 1 The lift control modules include the M adaptor(M2306) and lift control relay module(M2307),these two devices together make the control ofthe lift only to authorized floor possible.
Pos : 30 /Busc h-J aeg er (Neustr uktur)/Modul- Struktur /Online-Dokumentati on/Übersc hriften (--> Fü r alle D okumente <--)/1. Ebene/A - F /Ansc hluss @ 19\mod_1309248278435_15.doc x @ 107413 @ 1 @ 1 Connection M2306 Pos : 31 /Busc h-J aeg er (Neustr uktur)/Modul- Struktur /Online-Dokumentati on/Ansc hluss/Di mmer /Ansc hlus s - 6591 U-101 @ 23\mod_1333093920008_15.doc x @ 207132 @ @ 1 Fig.
- ON = Power on - OFF = Power off Setting LED - Blinks when working normally Address Set the module address The address range is 1--16, only the left 4 bits are used Power Supply Connect with M2306 Connect with the lift controller...
Page 8
ABB-Welcome Pos : 24 /Busc h-J aeg er (Neustr uktur)/Modul- Struktur /Online-Dokumentati on/Steuermodul e - Onli ne-D okumentation (--> F ü r all e D okumente <--)/++++++++++++ Seitenumbruc h ++++++++++++ @ 9\mod_1268898668093_0.doc x @ 52149 @ @ 1...
Page 9
ABB-Welcome 5.2.2 Lift control relay module address by binary setting Fig. 3...
ABB-Welcome Mounting / Installation Pos : 34 /Busc h-J aeg er (Neustr uktur)/Modul- Struktur /Online-Dokumentati on/Sic herheit (--> Fü r alle Dokumente <--)/Warnhinweis e/Sic herheit - Ni eders pannungs- und 230 V-Leitungen @ 18 \mod_1302617821491_15.doc x @ 103465 @ @ 1...
Page 11
ABB-Welcome • Use suitable personal protective clothing. • Use only suitable tools and measuring devices. • Check the type of supply network (TN system, IT system, TT system) to secure the following power supply conditions (classic connection to ground, protective earthing, necessary additional measures, etc.).
The device must only be installed on mounting rails according to DIN EN 50022. M2306 is highly recommended to install in the lift motor room on the top floor or the electrical riser; while M2307 is highly recommended to install in the lift cabin.
ABB-Welcome User case One M2306 and M2307 High building <=16 floors with one Lift Adaptor Pos : 41 /Busc h-J aeg er (Neustr uktur)/Modul- Struktur /Online-Dokumentati on/Inbetri ebnahme/Di mmer/Inbetriebnahme - 6591 U-101 @ 19\mod_1311948781023_15.doc x @ 108300 @ 222 @ 1...
Page 14
ABB-Welcome Wiring by one M2306 and M2307 Fig. 7...
ABB-Welcome One M2306 and M2307 High building >16 floors with one Lift Adaptor Fig. 8: Topology...
Page 16
Fig. 9 Remarks: 1.The first mini system controller(M2301) feeds M2306 and 1 M2307. 2. Any one more additionalM2307 should be locally powered by 1 mini system controller. Eg. 4 M2307 + 1 M2306, totally, 4 mini system controllers are needed.
ABB-Welcome Up to four lifts per building High building >16 floors Adaptor Adaptor Fig. 11: Topology Pos: 42 /Busch-Jaeger (Neustruktur)/Modul-Struktur/Online-Dokumentation/Steuermodule - Online- Dokumentation (--> Für alle Dokumente <--)/++++++++++++ Seitenumbruch ++++++++++++ @ 9\mod_1268898668093_0.docx @ 52149 @ @ 1 Remark: The address code can not be repeated.
ABB-Welcome Pos : 43 /Busc h-J aeg er (Neustr uktur)/Modul- Struktur /Online-Dokumentati on/Übersc hriften (--> Fü r alle D okumente <--)/1. Ebene/A - F /Bedienung @ 11\mod_1279185541649_15.doc x @ 83043 @ 1 @ 1 Operation Pos : 44 /Busc h-J aeg er (Neustr uktur)/Modul- Struktur /Online-Dokumentati on/Bedienung/Di mmer/Bedi enung - 6591 U-101 @ 23\mod_1333091293158_15.doc x @ 207069 @ @ 1 User Scenario Illustration of visitor target floor Fig.
ABB-Welcome Pos : 43 /Busc h-J aeg er (Neustr uktur)/Modul- Struktur /Online-Dokumentati on/Übersc hriften (--> Fü r alle D okumente <--)/1. Ebene/A - F /Bedienung @ 11\mod_1279185541649_15.doc x @ 83043 @ 1 @ 1 Pos : 44 /Busc h-J aeg er (Neustr uktur)/Modul- Struktur /Online-Dokumentati on/Bedienung/Di mmer/Bedi enung - 6591 U-101 @ 23\mod_1333091293158_15.doc x @ 207069 @ @ 1 User Scenario Illustration of resident target floor Fig.
Connected to PC During the configuration, lift control adaptor can be directly connected to PC where the installed PC software (ABB Welcome M PC Configuration Tool) can be used. In another word, no need of local power supply during configuration.
ABB-Welcome Configuration Basic Steps Step1: Set basic parameters of the apartment via Welcome M configuration tool Fig. 15 Function Select Building No. Select Floor No. Select Apartment No. Set Physical Add.(eg. 13 means the IS address set by IS switches) Set User Name Set Logic Add.(eg.
Page 23
ABB-Welcome Step2: Select Building, M2307 and Configure parameters of each relay Fig. 16 Function Select Building No Select M2307 No. Click “Add” to add a new M2307 Select ON or OFF for connecting the Relay Select NO or NC for output type...
Page 24
Building No.(same as Step2) Select OS No. Select Relay No. of M2307 Click “Add” to associate OS with Relay Send all parameters to M2306 Input password*(default password:123456) * please write down this password, if this password is forgotten, reload this software!
Page 25
Step4: Associate IS with M2307 Fig. 18 Function Building No.(same as Step2) Select IS Physical Add. Select Relay No. of M2307 Select OS No.(floor no. of OS installed) Click “Add” to associate IS with Relay Send all parameters to M2306 Input password(default password:123456)
Page 26
ABB-Welcome Optional steps: Step5: Export all data of this project or Import data for new project Fig. 19 Function Export all Lift Control Configuration data to one *.xls(read only) (Please export the Lift Control Configuration of each building after the configuration is sent for future use) Import data for a new project from one *.xls...
Page 27
ABB-Welcome Step6: Save as one new project Fig. 20 Function Save as one new project: *.xml...
Page 28
ABB-Welcome Step7: Open one existed project data to new OS, Guard Unit and Lift control Fig. 21 Function Open one existed project : *.xml...
Need help?
Do you have a question about the M2306 and is the answer not in the manual?