Page 2
Removing the Plastic Cargo 4. Using an overhead hoist, lower the cargo bed. 5. Remove the 2 pivot bolts (1/2 x 4-1/2 inches) and 2 locknuts (1/2 inch) from the pivot bracket located at 1. Using an overhead hoist, raise the plastic cargo bed. the rear of the machine (Figure 2.
Page 3
Installing the Steel Cargo Bed 5. Release the cargo-bed lever and raise the cargo bed using an overhead hoist. 1. Remove the 3 flange-head screws (5/16 x 3/4 inch), 6. Slide the short end of the prop rod into the detent prop rod U bracket, and prop rod from the bottom of slot (Figure...
Page 4
8. Install the T handle onto the button-head screw (Figure Figure 9 1. Button-head screw 2. T handle 9. Tighten the jam nut (3/8 inch) fully against the T handle (Figure 10). Figure 10 1. Jam nut (3/8 inch) 2. T handle...
Page 5
Installing Stake Sides Optional To install the optional stake sides, you need the following measurements and quantities of wood: Wood Dimensions Total Length of Each Board Quantity Needed 38 x 89 mm (2 x 4 inch) 36 cm (14 inches) 29 x 140 mm (5/4 x 6 inch) 117 cm (46 inches) You also need the following hardware:...
Page 8
The method of transmission shall be electronic transmittal. This machinery shall not be put into service until incorporated into approved Toro models as indicated on the associated Declaration of Conformity and in accordance with all instructions, whereby it can be declared in conformity with all relevant Directives.
Need help?
Do you have a question about the Workman GTX Series and is the answer not in the manual?
Questions and answers