2.2 Receiving, Handling, and Storage 2.2.1 Receiving 2.2.2 Handling 2.2.3 Storage 3. Usage and Operation for Advance, Advance 27, SafeGear, and SafeGear HD Manual G&T Devices 3.1 Grounding 3.2 Removing Ground/Withdrawing the Device 3.3 Testing 3.3.1 AC Withstand Voltage Test 3.3.2...
Should clarification or additional information be required, WARNING refer the matter to your nearest ABB Sales office. When communicating with ABB regarding the product covered by this IOM Manual, always reference the ABB assigned Indicates a hazardous situation that, if not Order number.
1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 2. Introduction & Safe Practices Scope Receiving, Handling, and Storage The purpose of this manual is to provide instructions for Ground & Test devices are subject to complete factory unpacking, storage, installation, operation production tests and inspection prior to packaging and maintenance for the Manual Ground &...
If the G&T devices are not placed in promptly notify the nearest district office. ABB is not service for some time, it is advisable to provide adequate responsible for damage of goods after delivery to the means of environmental protection.
1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 3. Usage Operation Advance, Advance 27, SafeGear, and SafeGear HD Manual G&T Devices WARNING This equipment may contain voltages at a level which may cause death or serious injury. This equipment should only be operated by qualified personnel.
Page 7
Maintenance Manual, document number: IB3.2.5-7C Chapter 8. d. Advance 27 Installation, Operations, and Maintenance Manual, document number: 1VAL017002-MB Section 5.10.1. Figure 3: Device installed in the switchgear breaker compartment Figure 5: The racking tool is used to move the device between the connect and disconnect positions 7.
Two cables per phase are required for the SafeGear HD 63 kA G&T device (see Figures 8 and 9). 5/15 kV 50 kA Advance/SafeGear and 27 kV Advance G&T 3.2 Removing Ground/Withdrawing the Device devices only require one cable per phase (not shown).
1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 3.3 Testing Prior to each use, the following tests should be completed to assure the G&T device is in good condition. 3.3.1 AC Withstand Voltage Test 1. Remove all grounding cables 2. For each terminal complete the following test sequence: a.
1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 4. Usage and Operation for ReliaGear ND G&T Devices WARNING This equipment may contain voltages at a level which may cause death or serious injury. This equipment should only be operated by qualified personnel.
Page 11
1VAL064601-MB Rev C Installation, Operations and Maintenance Manual Figure 15: Lower terminal configuration in connected position with field distributors Figure 13: Upper terminal configuration in installed disconnected position with field distributors installed 6. Close and secure the switchgear breaker compartment door. 7.
1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 4.2 Removing Ground/Withdrawing the Device 1. Rack the device to the disconnected position. 2. Open the switchgear breaker compartment door, disconnect and remove the ground bar. 4.3 Testing Prior to each use, the following tests should be completed to assure the G&T device is in good condition.
1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 4.4 Changing the position of the terminals 1. Place the G&T outside of the switchgear compartment on a level work surface. 2. Remove the (6) M8X25 screws, (6) M8 nuts, and (12) M8 washers that hold the insulation board onto the supports.
Page 14
Labels Kit 2RGA019075A0001 Contact Factory 2RGA021904A0001 2RGA021114P0001 Field Distributing Ball (3 Pieces Required) Primary Contact Plate 2RGA021098A0001 Assembly (1200 A) Primary Contact Plate 2RGA021098A0002 Assembly (2000 A) Note: contact your local ABB sales office for pricing and availability. Courtesy of NationalSwitchgear.com...
1VAL064601-MB Rev C Installation, Operations and Maintenance Manual Appendix 5/15 kV, 63 kA Manual G&T (SafeGear HD) Layout Drawing Note: dimensions in mm [in] Courtesy of NationalSwitchgear.com...
1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 27 kV, 1200/2000 A, 25 kA Manual G&T Layout Drawing Note: dimensions in mm [in] Courtesy of NationalSwitchgear.com...
1VAL064601-MB Rev C Installation, Operations and Maintenance Manual 5/15 kV, 50 kA Manual G&T Layout Drawing Note: dimensions in mm Courtesy of NationalSwitchgear.com...
ABB is committed to complying with the relevant legal ABB is committed to complying with all legal and other and other requirements for environmental protection relevant requirements for environmental protection in according to the ISO 14001 standard. The duty of the accordance with the ISO 14001 standards.
Page 20
In no event will ABB be responsible to the user in contract, in tort (including negligence), strict liability or otherwise for any special, indirect, incidental or consequential...
Page 21
1VAL064601-MB Rev C Installation, Operations and Maintenance Manual Notes Courtesy of NationalSwitchgear.com...
Page 22
Any reliance placed on such information is therefore strictly at your own risk. ABB reserves the Phone: +1 407 732 2000 right to discontinue any product or service at any time.