“3. Installing Rails” and the following steps. NOTE : If you use rack frames other than Hitachi racks, note the following: “2.1 Unpacking the RKU • Replace the values of the depth and width described in Rack Frame”...
Page 51
Front Rear *1: When DKC-F910I-CTL is not installed in DKC910I-CBX, use the nameplate of the item No. 4. When DKC-F910I-CTL is installed in DKC910I-CBX, use the nameplate of the item No. 6. (2) Attach the nameplates and label, showing corresponding locations to top side and rear side of the HSNBX.
INST(IN)07-01-10 7. Fastening Storage System NOTE: If you use rails other than Hitachi Vantara rails, check that screws securing the rails, and the like, are not protruded from the rack surface on which to install the Controller Chassis and that the rack surface is flat (see “Notes for Installing Controller Chassis”...
Page 179
Connect to the SVP display from the Maintenance PC by the remote desktop. step2: Prepare the media. step3: Uninstall any additional software installed on the SVP such as Hitachi Remote Ops/C-Track and Anti-Virus client. step4: Insert the media disk into the Maintenance PCʼs drive.
Need help?
Do you have a question about the DKC910I and is the answer not in the manual?
Questions and answers