40in Bagger Enhancement Kit
For 2006 and After Mid-Size Mowers
Model No. 110–2025
Loose Parts
Use the chart below to verify that all parts have been shipped.
Step
1
No parts required
Right side rubber bafe
Left side rubber bafe
Left metal bafe stiffener
2
Carriage bolt (5/16 x 1 inch)
Locknut (5/16 inch)
Right metal bafe stiffener
Step
1
Preparing the Mower Deck
No Parts Required
Procedure
1. Position the mower on a flat surface.
2. Disengage the PTO, move the motion control
levers to the neutral locked position and set
the parking brake.
3. Stop the engine, remove the key, and wait for
all moving parts to stop before leaving the
operating position.
4. Lift the front of the machine and support the
machine using jack stands.
5. Thoroughly clean the mower deck. All debris
must be removed to ensure the baffle will fit
properly against the mower deck.
6. Repair all bent and damaged areas of the
mower deck and replace any missing parts.
© 2005—The Toro® Company
8111 Lyndale Avenue South
Bloomington, MN 55420
Description
Step
Installing the Bafes
Parts needed for this step:
Procedure
Note: Install bolts as shown in Figure 1.
Register at www.Toro.com.
Form No. 3354-112 Rev A
Installation Instructions
Qty.
Prepare the mower deck for
–
installation.
1
1
1
Install the bafes.
8
8
1
Mechanical or hydraulic jacks may fail to
support the machine and cause a serious
injury.
• Use jack stands when supporting the
machine.
• Do not use hydraulic jacks.
2
1
Right side rubber bafe
1
Left side rubber bafe
1
Left metal bafe stiffener
8
Carriage bolt (5/16 x 1 inch)
8
Locknut (5/16 inch)
1
Right metal bafe stiffener
Use
Original Instructions (EN)
Printed in the USA.
All Rights Reserved
Need help?
Do you have a question about the 110-2025 and is the answer not in the manual?
Questions and answers