HP StorageWorks P9500 Site Preparation Guide Abstract This guide describes the site preparation for HP StorageWorks P9500 disk arrays. The intended audience is a storage system administrator or authorized service provider with independent knowledge of the HP StorageWorks P9500 and Remote Web Console.
Contents 1 Planning for installation................5 Responsibilities.........................5 User responsibilities......................5 HP responsibilities........................5 Installation planning checklist.....................5 2 Safety requirements..................8 General safety guidelines......................8 Work safety guidelines......................8 Warning about moving parts....................9 Electrical safety guidelines....................9 3 Installation requirements................10 Safety requirements.........................10 General site requirements......................10 Equipment clearances......................10 Equipment weight......................10 Storage requirements......................11 Data center requirements......................11 Data communication requirements....................11...
1 Planning for installation Unless otherwise specified, the term P9000 in this guide refers to the following disk array: P9500 Disk Array The GUI illustrations in this guide were created using a Windows computer with the Internet Explorer browser. Actual windows may differ depending on the operating system and browser used. GUI contents also vary with licensed program products, storage system models, and firmware versions.
Page 6
Location: The specific location in the data center (area or “footprint” on the floor) where the P9500 disk array will be installed. User Information Company Address Contact Phone Mobile Email Contact Phone Mobile Email HP Information Contact Phone Mobile Email Contact Phone Mobile...
Page 7
Installation Planning Checklist Does the data center provide appropriate fire protection for computer equipment such as P9500 disk arrays? Does the data center have a raised floor? Does the location meet the requirements for service clearance and cable routing (for example, floor cutouts)? Does the location meet the floor load rating requirements? Power Requirements...
2 Safety requirements General safety guidelines Observe the following general site guidelines: General Requirements: The data center must comply with all applicable safety regulations, standards, and requirements for installing and operating industrial computer equipment similar to a P9500 disk array. Fire protection: The data center must have an operational fire protection system appropriate for use with computer and electrical equipment.
and ramps to a raised computer room floor. Move the cabinet slowly and deliberately, and make sure that the floor is free from foreign objects and cables that the cabinet could roll over. WARNING! To avoid injury, wear protective footwear when moving equipment. Warning about moving parts Even though customers do not install or maintain equipment, these guidelines are provided to prevent possible injury when working with authorized service personnel.
3 Installation requirements Safety requirements Safety requirements and guidelines are covered in “Safety requirements” (page General site requirements The customer site must accommodate the delivery and movement of the equipment from the receiving dock to the installation location in the data center. Equipment clearances Receiving area: The receiving dock, storage area, and receiving area must be large enough to allow movement of and access to crated or packed equipment.
Table 3 Weight of typical P9500 system configurations Dimension Single Rack Single Module Dual Module (3 racks) (6 racks) System Min (lbs/kg) 1 152/522 (Diskless) 2984/1354 5878/2666 Weight Max (lbs/kg) 1564/709 4342/1970 8907/4040 Storage requirements If the equipment must be stored after delivery and prior to installation, the storage location must meet the storage environmental requirements for the P9500 disk array.
Table 5 Data communication requirements Column Head Column Head Internet connectivity infrastructure for C-Track Internetbased For the C-Track Internet connectivity, HP representatives remote support option. will help you obtain and set up/order the necessary infrastructure, including your choice of router configurations, a supported CMS management server, and access to SMTP server (optional) and DNS servers, in order to support reliable file transfer and serve the overall...
Page 13
NOTE: HP Insight Remote Support Standard is not supported on XP and P9500 Disk Arrays. Table 6 P9500 disk array remote support products HP Product Description Application AE241A HP XP/P9500 Remote Device Access For customers that fully commit to use Support HP Remote Support.
http://www.software.hp.com Select Insight Remote Support from the menu on the right. System specifications and requirements This section describes the physical characteristics of a P9500 disk array, including “Mechanical specifications” (page 14) “Electrical specifications” (page 16) “Environmental specifications” (page 19) Mechanical specifications The following table lists the mechanical specifications of the P9500 disk array.
Page 15
Figure 1 P9500 disk array Figure 2 Example P9500 disk array configurations System specifications and requirements...
Electrical specifications “P9500 Electrical specifications - single phase current” (page 16) “P9500 Electrical specifications - three phase current” (page 17) list the electrical specifications of the P9500 disk array, including power requirements and power consumption. Table 8 P9500 Electrical specifications - single phase current Item Unit Specification...
Table 9 P9500 Electrical specifications - three phase current Item Unit Specification Power requirements AC, 3 Phase delta 208 V +5/- 1 5%, 50/60 Hz Power consumption . Drive Rack (384 HDD) 4.3KVA (2.5" SAS) NOTE: The power Maximum 41.4 KVA consumption of the system is the same whether it uses Controller chassis power...
Power connection The AC power input for the P9500 disk array has a duplex PDU structure. This duplex structure enables the entire rack to remain powered on if power is removed from one of the two power distribution panels. CAUTION: When installing a system, connect the AC cables between the PDUs and PDPs correctly.
NOTE: PDU models can be changed in the field using offline maintenance procedures Figure 3 P9500 AC Power Configuration Diagram Environmental specifications Table 1 1 (page 19)provides the environmental specifications and requirements for the P9500 disk array. Table 1 1 P9500 environmental specifications Item Operating Not Operating...
Table 1 1 P9500 environmental specifications (continued) Item Operating Not Operating In Storage Vibration 10 to 300 Hz 5 to 10 Hz: 2.5 mm Sine Vibration: to 10Hz: 0.25 mm 0.49 m/s 10 to 70 Hz: 4.9 m/s 4.9 m/s , 5 min.
Table 13 Service clearance and floor load ratings (continued) Service Clearance and Floor Load Rating Number of racks Section 3 (left module) “Three rack configuration (left module)” (page 28) 3 (right module) “Three rack configuration (right module)” (page 30) 4 (left module) “Four rack configuration (left module)”...
Page 23
Figure 4 Service clearances for a single rack system Table 14 Floor load rating and required clearances for single rack configuration Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 Service clearance, floor cutout, and floor load rating...
Table 14 Floor load rating and required clearances for single rack configuration (continued) Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 Notes: 1. Actual clearances for installation should be determined after consulting withconstruction specialist responsible for installation building, as they could varydepending on the size/layout of the system and building conditions.
Page 25
Figure 5 Service clearances for a two rack system (single DKC) Table 15 Floor load rating and required clearances for two rack configuration Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 Service clearance, floor cutout, and floor load rating...
Table 15 Floor load rating and required clearances for two rack configuration (continued) Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 Notes: 1. Actual clearances for installation should be determined after consulting with construction specialist responsible for installation building, as they could vary depending on the size/layout of the system and building conditions.
Page 27
Figure 6 Service clearances for a two rack system (two DKC) Table 16 Floor load rating and required clearances for a two rack configuration (two DKC) Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 Service clearance, floor cutout, and floor load rating...
Table 16 Floor load rating and required clearances for a two rack configuration (two DKC) (continued) Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 Notes: 1. Actual clearances for installation should be determined after consulting with construction specialist responsible for installation building, as they could vary depending on the size/layout of the system and building conditions.
Page 29
Figure 7 Service clearances for a three rack system (left module) Table 17 Floor load rating and required clearances for a three rack configuration (left module) Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 Service clearance, floor cutout, and floor load rating...
Table 17 Floor load rating and required clearances for a three rack configuration (left module) (continued) Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 Notes: 1. Actual clearances for installation should be determined after consulting with construction specialist responsible for installation building, as they could vary depending on the size/layout of the system and building conditions.
Page 31
Figure 8 Service clearances for a three rack system (right module) Table 18 Floor load rating and required clearances for a three rack configuration (right module) Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 0 .1 Service clearance, floor cutout, and floor load rating...
Table 18 Floor load rating and required clearances for a three rack configuration (right module) (continued) Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 Notes: 1. Actual clearances for installation should be determined after consulting with construction specialist responsible for installation building, as they could vary depending on the size/layout of the system and building conditions.
Page 33
Figure 9 Service clearances for a four rack system (left module) Table 19 Floor load rating and required clearances for a four rack configuration (left module) Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 0 .1 Service clearance, floor cutout, and floor load rating...
Table 19 Floor load rating and required clearances for a four rack configuration (left module) (continued) Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 Notes: 1. Actual clearances for installation should be determined after consulting with construction specialist responsible for installation building, as they could vary depending on the size/layout of the system and building conditions.
Page 35
Figure 10 Service clearances for a four rack system (right module) Table 20 Floor load rating and required clearances for a four rack configuration (right module) Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 0 .1 Service clearance, floor cutout, and floor load rating...
Table 20 Floor load rating and required clearances for a four rack configuration (right module) (continued) Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 Notes: 1. Actual clearances for installation should be determined after consulting with construction specialist responsible for installation building, as they could vary depending on the size/layout of the system and building conditions.
Page 37
Figure 1 1 Service clearances for a five rack system Table 21 Floor load rating and required clearances for a five rack configuration Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 Service clearance, floor cutout, and floor load rating...
Table 21 Floor load rating and required clearances for a five rack configuration (continued) Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 0 .1 Notes: 1. Actual clearances for installation should be determined after consulting with construction specialist responsible for installation building, as they could vary depending on the size/layout of the system and building conditions.
Page 39
Figure 12 Service clearances for a six rack system Service clearance, floor cutout, and floor load rating...
Table 22 Floor load rating and required clearances for a six rack configuration Floor Load Required Clearance (a+b) m Rating Clearance (c) m (kg/m2) C=0.2 C=0.4 C=0.6 C=0.6 0 .1 Notes: 1. Actual clearances for installation should be determined after consulting with construction specialist responsible for installation building, as they could vary depending on the size/layout of the system and building conditions.
4 Support and other resources Contacting HP For worldwide technical support information, see the HP support website: http://www.hp.com/support Before contacting HP, collect the following information: Product model names and numbers Technical support registration number (if applicable) Product serial numbers Error messages Operating system type and revision level Detailed questions Subscription service...
WARNING! Indicates that failure to follow directions could result in bodily harm or death. CAUTION: Indicates that failure to follow directions could result in damage to equipment or data. IMPORTANT: Provides clarifying information or specific instructions. NOTE: Provides additional information. TIP: Provides helpful hints and shortcuts.
Glossary access method An IBM-specific term for software that moves data between main storage and I/O devices to create channel programs and manage system buffers. Arbitrated loop. AL-PA Arbitrated loop physical address. allocation The ratio of allocated storage capacity versus total capacity as a percentage. Allocated storage refers to those logical devices (LDEVs) that have paths assigned to them.
Page 45
on the disk array model. Each CU can manage multiple LDEVs. Therefore, to uniquely identify a particular LDEV requires both the CU number and the LDEV number. CV AE HP StorageWorks P9000 Command View Advanced Edition. A software product that installs on a user-provided server and provides a browser-based platform from which you can manage the P9000 family of disk arrays CVS devices (OPEN-x CVS or 3390-x CVS) are custom volumes configured using array...
Page 46
Hardware Configuration Definition. Hard disk drive. HORCM_CMD A section of the RAID Manager instance configuration file that defines the disk devices used as command devices by RAID Manager to communicate with the disk array. HORCM_DEV A section of the RAID Manager instance configuration file that describes the physical volumes corresponding to the paired volume names.
Page 47
P-VOL Primary volume. Physical address. parity group A set of hard disk drives that have the same capacity and that are treated as one group. A parity group contains both user data and parity information, which enables user data to be accessed if one or more drives in the group is not available.
Page 48
Remote Web A browser-based program installed on the SVP that allows you to configure and manage the disk Console array. Remote I/O. HP StorageWorks RAID Manager. Red Hat package manager. S-VOL Secondary or remote volume. The copy volume that receives the data from the primary volume. Serial Attached SCSI.